Buzurgan Pipeline Project

Fast-track project to process sour gas for power generation in Iraq within 15-month timeline.
Installation of on grid solar system at RASHEE workshop

A solar system consisting of 3,240 panels arranged into 180 strings with 18 inverters (60 kW per string) was installed, integrating a smart control system that monitors daily, monthly, and annual output for the Heavy Equipment Plant in Awirij.