As part of an initiative to promote sustainability and energy efficiency, a solar power system was installed at the Heavy Equipment Plant in Awerij. The project included detailed design and comprehensive supply of materials, aiming to make solar energy a primary and efficient power source for the facility.
The scope of work included:
Detailed design & sizing
- Procurement of all necessary materials and consumables
- 3240 solar panels divided by 180 strings, every 10 strings connected with one inverter string capacity (60) KW
- quantity of inverter (18) pcs
The station has a special control system that provides reports on daily, monthly, and annual production, gives fully reports about equipment capability and charts of production rate including time details and production level
Previous
Next