Project Overview

As part of an initiative to promote sustainability and energy efficiency, a solar power system was installed at the Heavy Equipment Plant in Awerij. The project included detailed design and comprehensive supply of materials, aiming to make solar energy a primary and efficient power source for the facility.

The scope of work included:

Detailed design & sizing

  • Procurement of all necessary materials and consumables 
  • 3240 solar panels divided by 180 strings, every 10 strings connected with one inverter string capacity (60) KW
  •  quantity of inverter (18) pcs

The station has a special control system that provides reports on daily, monthly, and annual production, gives fully reports about equipment capability and charts of production rate including time details and production level

 

Location:

Featured :

A solar system consisting of 3,240 panels arranged into 180 strings with 18 inverters (60 kW per string) was installed, integrating a smart control system that monitors daily, monthly, and annual output for the Heavy Equipment Plant in Awirij.

Together, we are shaping a better world.