Installation of on grid solar system at RASHEE workshop

Installation of on grid solar system at RASHEE workshop

As part of an initiative to promote sustainability and energy efficiency, a solar power system was installed at the Heavy Equipment Plant in Awerij. The project included detailed design and comprehensive supply of materials, aiming to make solar energy a primary and efficient power source for the facility.

The scope of work included:

  • Detailed design & sizing
    • Procurement of all necessary materials and consumables
    • 3240 solar panels divided by 180 strings, every 10 strings connected with one inverter string capacity (60) KW
    • quantity of inverter (18) pcs

The station has a special control system that provides reports on daily, monthly, and annual production, gives fully reports about equipment capability and charts of production rate including time details and production level